Optimization of Waste Bank Facility Layout Using a Systematic Layout Planning Approach and the BLOCPLAN Algorithm

Main Article Content

Susmitha Canny
Bagus Anugrah Ramadhan
Kinanti Dwi Handayani

Abstract

Facility layout efficiency is a key factor in supporting sustainable waste bank management. This study aims to optimize the facility layout of the Resik Babakan Sari Waste Bank in Bandung City using a Systematic Layout Planning (SLP) approach and the BLOCPLAN algorithm. The research methods include observation, interviews, and process analysis using Value Stream Mapping (VSM) and Process Activity Mapping (PAM) to identify value-added (VA) and non-value-added (NVA) activities. Data on material handling frequency, space requirements, and closeness relationships between facilities were processed using BLOCPLAN software to generate more efficient layout alternatives. The results show that the total material handling distance is reduced from 204.5 meters to 127.48 meters, representing a 37.7% reduction. This improvement enhances material flow efficiency, reduces internal transportation time, and improves operator safety and comfort. Therefore, the integration of SLP and BLOCPLAN is effective in producing a more efficient, ergonomic, and sustainable facility layout.

Downloads

Download data is not yet available.

Article Details

How to Cite
Canny, S., Ramadhan, B. A., & Handayani, K. D. (2026). Optimization of Waste Bank Facility Layout Using a Systematic Layout Planning Approach and the BLOCPLAN Algorithm. Journal of Integrated System, 9(1), 59–71. https://doi.org/10.28932/jis.v9i1.15370
Section
Articles
Author Biography

Susmitha Canny, Program Studi Teknik Industri, Fakultas Rekayasa Industri, Universitas Telkom, Bandung, Indonesia

Susmitha Canny, S.T., MBA, Ph.D., menyelesaikan pendidikan Sarjana di bidang Teknik Industri dari Institut Teknologi Sepuluh Nopember pada tahun 2019. Ia kemudian meraih gelar Magister Administrasi Bisnis dengan konsentrasi Human Factors di jurusan Manajemen Industri dari National Taiwan University of Science and Technology pada tahun 2021, dan melanjutkan studi doktoralnya di institusi yang sama hingga memperoleh gelar Doktor dalam bidang Manajemen Industri pada tahun 2024. Saat ini, ia berperan sebagai dosen di Program Studi Teknik Industri, Telkom University, Indonesia. Bidang penelitian yang diminatinya mencakup faktor manusia dan ergonomi, dengan penekanan pada ergonomi kognitif, performa dalam lingkungan virtual dan mixed reality, serta interaksi manusia dan komputer.

References

Badan Pusat Statistik Kota Bandung (2023) Statistik lingkungan hidup Kota Bandung 2023. Available at: https://bandungkota.bps.go.id (Accessed: 26 October 2025).

Bouramtane, K. et al. (2024) ‘A comprehensive review of static and dynamic facility layout problems’, Annual Reviews in Control, 58, p. 100970. Available at: https://doi.org/10.1016/j.arcontrol.2024.100970.

Brilianto, R. and Waluyowati, N.P. (2024) ‘Analisis proses produksi dengan value stream mapping pada industri manufaktur’, Jurnal Kewirausahaan dan Inovasi, 3(4), pp. 1095–1103. Available at: https://doi.org/10.21776/jki.2024.03.4.14.

Budiyarto, A., Clarke, B. and Ross, K. (2025) ‘Overview of waste bank application in Indonesian regencies’, Waste Management & Research: The Journal for a Sustainable Circular Economy, 43(3), pp. 306–321. Available at: https://doi.org/10.1177/0734242X241242697.

Fatinnisa, G.A. and Saifuddin, J.A. (2024) ‘Analysis of value stream mapping (VSM) in the application of lean manufacturing to minimize waste at PT. Karya Indah Medika’, IJIEM - Indonesian Journal of Industrial Engineering and Management, 5(1), p. 234. Available at: https://doi.org/10.22441/ijiem.v5i1.22395.

Febriani, F. and Wurjaningrum, F. (2024) ‘Systematic layout planning to improve facility layout in small and medium food enterprise’, Southeast Asian Business Review, 2(2), pp. 111–117. Available at: https://doi.org/10.20473/sabr.v2i2.60850.

Haryanto, A.T., Hisjam, M. and Yew, W.K. (2021) ‘Redesign of facilities layout using systematic layout planning (SLP) on manufacturing company: a case study’, IOP Conference Series: Materials Science and Engineering, 1096(1), p. 012026. Available at: https://doi.org/10.1088/1757-899X/1096/1/012026.

Heragu, S.S. (2018) Facilities design. London: CRC Press.

Hines, P. and Rich, N. (1997) ‘The seven value stream mapping tools’, International Journal of Operations & Production Management, 17(1), pp. 46–64. Available at: https://doi.org/10.1108/01443579710157989.

Jasrotia, M.S. and Sengottaiyan, K. (2024) ‘SLP (systematic layout planning) for enhanced plant layout efficiency’, International Journal of Science and Research (IJSR), 13(6), pp. 820–827. Available at: https://doi.org/10.21275/SR24610212609.

Kaza, S. et al. (2018) What a waste 2.0: A global snapshot of solid waste management to 2050. Washington, DC: World Bank. Available at: https://doi.org/10.1596/978-1-4648-1329-0.

Khasanah, U., Sutarto, A.P. and Izzah, N. (2022) ‘Work facilities improvement using systematic layout planning to reduce the risk of manual handling’, Journal of Novel Engineering Science and Technology, 1(01), pp. 15–23. Available at: https://doi.org/10.56741/jnest.v1i01.56.

Mariboto, D. et al. (2023) ‘Perancangan ulang tata letak untuk pengoptimalisasian ruang pada toko ritel RDSP Bogor’, Jurnal Teknologi dan Manajemen Industri Terapan, 2(2), pp. 135–143. Available at: https://doi.org/10.55826/tmit.v2i2.161.

Muther, R. and Hales, L. (2015) Systematic layout planning. Management & Industrial Research Publications.

Narke, M.M. and Jayadeva, C.T. (2020) ‘Value stream mapping: effective lean tool for SMEs’, Materials Today: Proceedings, 24, pp. 1263–1272. Available at: https://doi.org/10.1016/j.matpr.2020.04.441.

Novitasari, B.D. and Rochmoeljati, R. (2021) ‘Implementasi value stream mapping dan value stream analysis untuk meminimalisir pemborosan waktu pendistribusian di PT. Nur Jaya Energi’, JUMINTEN, 2(6), pp. 132–143. Available at: https://doi.org/10.33005/juminten.v2i6.336.

Pamungkas, I., Akmal, A.K. and Irawan, H.T. (2024) ‘Blocplan algorithm for facility layout design in various industry in Indonesia’, Jurnal Inotera, 9(1), pp. 212–219. Available at: https://doi.org/10.31572/inotera.Vol9.Iss1.2024.ID327.

Ramadhan, R.F., Ernawati, D. and Nugraha, I. (2026) ‘VSM reduces lead time in fabrication material warehouse operations’, Academia Open, 11(1). Available at: https://doi.org/10.21070/acopen.11.2026.13491.

Reid, R.D. and Sanders, N.R. (2005) Operations management: an integrated approach. John Wiley.

Rother, M. and Shook, J. (2018) Learning to see: value-stream mapping to create value and eliminate muda. Brooklyn: Lean Enterprise Institute.

Setiawan, I., Tumanggor, O.S.P. and Purba, H.H. (2021) ‘Value stream mapping: literature review and implications for service industry’, Jurnal Sistem Teknik Industri, 23(2), pp. 155–166. Available at: https://doi.org/10.32734/jsti.v23i2.6038.

Shaputra, F. et al. (2025) ‘Tata letak fasilitas industri kecil menengah Iwan Batako menggunakan metode systematic layout planning dan grafik’, Jurnal Teknologi dan Manajemen Industri Terapan, 4(4), pp. 1347–1357. Available at: https://doi.org/10.55826/ef2nma03.

Sinatrya, Y. and Ekawati, A.D. (2025) ‘Implementing lean manufacturing using value stream mapping for automotive maintenance efficiency’, Advance Sustainable Science Engineering and Technology, 7(4), p. 0250404. Available at: https://doi.org/10.26877/asset.v7i4.2091.

Suwandi, N.N. and Suhada, K. (2025) ‘Penerapan lean manufacturing dengan metode value stream mapping untuk mengurangi cycle time pada bagian perakitan spring mattress di PT X’, Journal of Integrated System, 7(2), pp. 111–133. Available at: https://doi.org/10.28932/jis.v7i2.8694.

Utomo, P. and Pudji, E. (2025) ‘Analysis of waste in the production system with the approach lean manufacturing method’, Journal La Multiapp, 6(2), pp. 270–286. Available at: https://doi.org/10.37899/journallamultiapp.v6i2.1999.

Wamad, S. (2023) ‘Produksi sampah di Bandung meningkat tiap tahun’, Detik Jabar, 18 May. Available at: https://www.detik.com/jabar/berita/d-6724978/produksi-sampah-di-bandung-meningkat-tiap-tahun? (Accessed: 26 October 2025).