Analisis Risiko Pada Proyek Konstruksi Perumahan Dengan Metode House of Risk (HOR) (Studi Kasus: Proyek Konstruksi Perumahan PT ABC)
Main Article Content
Abstract
Downloads
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
By submitting an article with the title above and acceptance publication of the article, I declare that:
- Articles have never been previously published in scientific journals, proceedings or other electronic journals.
- I agree that the article copyright is fully owned by the Journal of Integrated System, Universitas Kristen Maranatha. Declaration of copyright transfer from the author's to the journal is done by completing the following form (Copyright Transfer Agreement).
Journal of Integrated System (JIS) uses a Copyright policy under a Creative Commons Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) license.
References
Arianie, G. P., and Puspitasari, N. B. (2017) ‘Perencanaan manajemen proyek dalam meningkatkan efisiensi dan efektifitas sumber daya perusahaan (studi kasus: Qiscus Pte Ltd)’, J@ ti Undip J. Tek. Ind, Vol. 12 No. 3, Hal 189
Cooper, D. F., Grey, S., Raymond, G., and Walker, P. (2005) Project risk management guidelines. john Wiley & Sons Ltd. West Sussex
Duffield, C., and Trigunarsyah, B. (1999) Project management conception to completion. Engineering Education Australia (EEA). Australia
Herdiansyah, H. (2010) Metodologi penelitian kuantitatif [research method for qualitative]. Salemba Humanika. Jakarta
Kerzner, H. (2001) Project management. 7th Edition. John Wiley & Sons, Inc. New York
Kurniasri Dewi. (2020) ‘Aplikasi model House of Risk (HOR) untuk mitigasi risiko pada supply chain bahan baku kulit’, Jurnal Ilmiah Teknik Industri, Vol. 13 No. 2, hal 149-157
Labombang, M. (2011) ‘Manajemen risiko dalam proyek konstruksi’, SMARTek, Vol. 9 No. 1, Pebruari 2011: 39 - 46
Magdalena, R., and Vannie, V. (2019) ‘Analisis risiko supply chain dengan model House of Risk (Hor) pada PT. Tatalogam Lestari’, J@ ti Undip: Jurnal Teknik Industri, 14(2), hal 53-62
Nurhayati. (2014) ‘Analisis manajemen risiko dan strategi penanganan risiko pada PT Agility International menggunakan metode House of Risk (Hor)’, Jurnal Logistik Bisnis, Vol. 10 No. 2, hal 4-11
Philip Best. (1998) Implementing value at risk. John Wiley & Sons. Chicester
Putri, M. N., Zaidir, A. H., and Hasan, A. (2015) ‘Analisis manajemen resiko proyek pembangunan rumah sakit Universitas Andalas’, Prosiding 2nd Andalas Civil Engineering National Conference. Vol. 13, 59=69
Safrudin, M. J., and Hasibuan, S. (2020) ‘Strategi mitigasi risiko proyek konstruksi utilitas piping dan pekerjaan sipil: Studi kasus PDAM Jakarta’, Operations Excellence, 2020, 12(1), 74-87
Saraswati, P. G., and Negoro, N. P. (2014) ‘Identifikasi faktor kritis pada rencana pembangunan unit pembangkit listrik tenaga mini hidro Lodoyo Blitar dengan pendekatan House of Risk’, Prosiding Seminar Nasional Manajemen Teknologi XXI, A-49-1- A-49-8
Sibuea, M. E., and Saragi, H. S. (2019) ‘Analisis risiko keterlambatan material dan komponen pada proyek pembangunan kapal dengan metode House of Risk (HOR) studi kasus: pembangunan kapal Ro-Ro 300 Danau Toba’, Jurnal Sistem Teknik Industri, Vol. 21 No. 2, 2019, 28-42
Wena, M. (2015) ‘Manajemen risiko dalam proyek konstruksi’, Jurnal Bangunan, Vol. 20, hal 1-12
Wideman, M. R. (1992) Project And Program Risk Management: A Guide To Managing Project Risk Opportunities. Project Management Institute. USA