Usulan Penjadwalan Mesin Paralel Menggunakan Metode Ant Colony Optimization Algorithm dan Longest Processing Time
Main Article Content
Abstract
Downloads
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
By submitting an article with the title above and acceptance publication of the article, I declare that:
- Articles have never been previously published in scientific journals, proceedings or other electronic journals.
- I agree that the article copyright is fully owned by the Journal of Integrated System, Universitas Kristen Maranatha. Declaration of copyright transfer from the author's to the journal is done by completing the following form (Copyright Transfer Agreement).
Journal of Integrated System (JIS) uses a Copyright policy under a Creative Commons Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) license.
References
de Abreu, A.P. and Fuchigami, H.Y. (2022) ‘An efficiency and robustness analysis of warm-start mathematical models for idle and waiting times optimization in the flow shop’, Journal Computers and Industrial Engineering, 166. Available at:
https://doi.org/10.1016/j.cie.2022.107976.
Baker, K.R. and Trietsch, D. (2018) Principles of sequencing and scheduling. 2nd edn. Wiley.
Blum, C. (2005) ‘Ant colony optimization: Introduction and recent trends’, Journal Physics of Life Reviews. 2(4), pp 353-373. Available at: https://doi.org/10.1016/j.plrev.2005.10.001.
Della Croce, F. and Scatamacchia, R. (2020) ‘The longest processing time rule for identical parallel machines revisited’, Journal of Scheduling, 23(2), pp. 163–176.
Demir, H.I.C. (2020) ‘Dynamic integrated process planning, scheduling and due-date assignment using ant colony optimization’, Journal Computer & Industrial Engineering, 149.
Dorigo, M. and Blum, C. (2005) ‘Ant colony optimization theory: a survey’, Journal Theoretical Computer Science, 344(2–3), pp. 243-278. Available at: https://doi.org/10.1016/j.tcs.2005.05.020.
Febianti, E., Muharni, Y. and Azhary, M.N. (2020) ‘Penjadwalan produk menggunakan teknik enumerasi’, Journal of Integrated System, 3(2), pp. 180-193. Available at: https://doi.org/10.28932/jis.v3i2.2900.
Fera, M. et al. (2013) ‘Production scheduling approaches for operations management’, in M.M. Schiraldi (ed.) Operations management. InTech. Available at: https://doi.org/10.5772/55431.
Liliani and Alfian, A. (2014) ‘Usulan penjadwalan produksi dengan algoritma Ant Colony (studi kasus PT Shima Prima Utama Palembang)’, in Simposium Nasional RAPI XIII - FT UMS. Available at: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://publikasiilmiah.ums.ac.id/xmlui/bitstream/handle/11617/5517/2.Liliani.pdf?sequence=1&isAllowed=y.
Lopez, P. and Roubellat, F. (2010) Production scheduling. Wiley.
Luo, Y. et al. (2020) ‘Charging scheduling strategy for different electric vehicles with optimization for convenience of drivers, performance of transport system and distribution network’, Journal Energy, 194. Available at: https://doi.org/10.1016/j.energy.2019.116807.
Muharni, Y. et al. (2020) ‘The application of LPT, CEGA, and PSO method on flow shop scheduling with parallel machine’, in IOP Conference Series: Materials Science and Engineering. Available at: https://doi.org/10.1088/1757-899X/909/1/012054.
Muharni, Y., Febianti, E. and Sofa, N.N. (2019) ‘Minimasi makespan pada penjadwalan flow shop mesin paralel produk steel Bridge B-60 menggunakan metode Longest Processing Time dan Particle Swarm Optimization’, Journal Industrial Servicess, 4(2). Available at: https://doi.org/10.36055/jiss.v4i2.5154.
Muharni, Y., Saeful M, A.I. and Rubyanti, T.E. (2020) ‘Penjadwalan flow shop mesin paralel menggunakan metode Longest Processing Time dan Cross Entropy-Genetic Algorithm pada pembuatan produk steel Bridge B-60’, Jurnal Ilmiah Teknik Industri, 7(3). Available at: https://doi.org/10.24912/jitiuntar.v7i3.6338.
Panggabean, J.F.R. (2018) ‘Hybrid ant colony optimization-genetics algorithm to minimize makespan flow shop scheduling’, International Journal of Engineering and Technology (UAE), 7(2.2). Available at: https://doi.org/10.14419/ijet.v7i2.2.11868.
Panjaitan, A.H. and Ginting, R. (2019) ‘Usulan penjadwalan produksi dengan algoritma Ant Colony (studi kasus PT. KLM Medan)’, in Talenta Conference Series: Energy and Engineering (EE). Available at: https://doi.org/10.32734/ee.v2i3.760.
Pinedo, M.L. (2016) Scheduling: theory, algorithms, and systems. 4th edn. New York: Springer.
Rui, Z. et al. (2014) ‘An ant colony algorithm for job shop scheduling problem with tool flow’, in Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 228(8). Available at: https://doi.org/10.1177/0954405413514398.
Sivakumar, P. et al. (2015) ‘Real-time task scheduling for distributed embedded system using MATLAB toolboxes’, Indian Journal of Science and Technology, 8(15), pp. 1-7. Available at: https://doi.org/10.17485/ijst/2015/v8i15/55680.
Toksari, M.D. (2016) ‘A hybrid algorithm of Ant Colony Optimization (ACO) and Iterated Local Search (ILS) for estimating electricity domestic consumption: case of Turkey’, International Journal of Electrical Power and Energy Systems, 78, pp. 776–782.