[1]
Sari, S., Imron, F.F., Nurfajriah, N. and Rahayu I.M, F. 2022. Workload Analysis with Full Time Equivalent Method to Optimize Production Unit Performance at PT X. Journal of Integrated System. 5, 2 (Dec. 2022), 173–183. DOI:https://doi.org/10.28932/jis.v5i2.5404.