SARI, S.; IMRON, F. F.; NURFAJRIAH, N.; RAHAYU I.M, F. Workload Analysis with Full Time Equivalent Method to Optimize Production Unit Performance at PT X. Journal of Integrated System, [S. l.], v. 5, n. 2, p. 173–183, 2022. DOI: 10.28932/jis.v5i2.5404. Disponível em: http://114.7.153.31/index.php/jis/article/view/5404. Acesso em: 12 dec. 2024.