[1]
S. Sari, F. F. Imron, N. Nurfajriah, and F. Rahayu I.M, “Workload Analysis with Full Time Equivalent Method to Optimize Production Unit Performance at PT X”, JIS, vol. 5, no. 2, pp. 173–183, Dec. 2022.