1.
Sari S, Imron FF, Nurfajriah N, Rahayu I.M F. Workload Analysis with Full Time Equivalent Method to Optimize Production Unit Performance at PT X. JIS [Internet]. 2022Dec.27 [cited 2024Dec.12];5(2):173-8. Available from: http://114.7.153.31/index.php/jis/article/view/5404