Analysis of Construction Material Shipment Using Trucking and Joint Shipment Multiple Project Methods on Cost and Time
DOI:
https://doi.org/10.28932/jts.v22i2.12693Keywords:
Cost, Joint Shipment, Time, TruckingAbstract
Construction work outside Java Island has a high level of complexity. The long distance from urban areas, combined with access that is still difficult to reach, is one of the factors that make construction work challenging, which can affect the time and cost of the construction project. The purpose of this study is to analyze and identify alternative solutions for transporting construction materials with a specific volume. The method used is the Google Collaboratory application to determine the time required, while the costs are analyzed by calculating the transportation costs with various types of transportation. Analysis of the cost of Joint Shipment Multiple Project using Barges costs Rp. 2,450,000,000 in 1 trip. Trucking with several types of vehicles: trailer 40FT 103 trips with cost of Rp. 6,879,000,000, tronton 110 trips with cost of Rp. 4,768,500,000, fuso long 205 trips with cost of Rp. 6,998,000,000, standard fuso 308 trips with cost of Rp. 10,230,125,000, 20FT container 155 trips for Rp. 3,600,875,000, 21FT container 155 trips for Rp. 3,972,125,000, and 40FT/HC container 123 trips at cost of Rp. 4,525,800,000. Analysis of time using the Google Collaboratory application, namely the trucking method, has the fastest average of 7.30 days - 7.90 days, while the barge has an average duration of 19.5 days in 1 trip. The conclusion through data analysis from this study produced a more efficient and effective transportation method for costs and time is the Joint Shipment Multiple Project Method using barges, with an efficiency of 60.37% - 90.48% than the trucking method and only requires one trip.Downloads
References
Angkaleda, dkk. (2025). Faktor Pengaruh Manajemen Material terhadap Kinerja Pelaksanaan pada Proyek Konstruksi (Factors of Influence of Material Management on Implementation Performance in Construction Projects). Research Review Jurnal Ilmiah Multidisiplin, 4(1).
Ariadi. (2017). Faktor Kunci Sukses Penerapan Value Engineering (VE) pada Bangunan Gedung di Indonesia. Rekayasa Sipil, 6(2), 77–85.
Arifin, J. (2019). Menguasai Microsoft Excel 2019.
Chohan, I. M., Ahmad, A., Sallih, N., Bheel, N., Ali, M., & Deifalla, A. F. (2023). A Review on Life Cycle Assessment of Different Pipeline Materials. Results in Engineering, 19 (May), 101325. https://doi.org/10.1016/j.rineng.2023.101325
Fakhrurrozi. (2017). Penanganan, Pengaturan dan Pengamatan Muatan Kapal.
Falahah S.Si M.T. (2023). Algoritma dan Pemrograman: Implementasi dengan Python pada Google Colab (Nita N.M., Ed.). PT Remaja Rosdakarya.
Febrian Putri, A., Sasi Kirana, A., Putri Permata Sari, B., Ayu Agustian, S., & Purwaningrum, T. (2025). Optimalisasi Biaya Distribusi Bangunan CV Sari Gunung dengan Metode Transportasi. PENG: Jurnal Ekonomi Dan Manajemen, 2(2), 2659–2666.
https://doi.org/10.62710/3m1vw314
Girsang, H., & Chamami, I. (2024). Kendali Mutu Produksi Concrete Tunnel Segment Berbasis Metode Six Sigma Proyek Pembangunan Mass Rapid Transit. Jurnal Teknik Sipil, 20(1), 43–62. https://doi.org/10.28932/jts.v20i1.6391
Girsang, H., Lutfiansyah, Y., & Rochmad, I. (2025). The Influence of the Material Specification Plan of Gas Transmission Pipeline Construction on Cost Performance. Rekayasa Sipil, 19(3), 356–362. https://doi.org/10.21776/ub.rekayasasipil.2025.019.03.12
Hardina, N. (2022). Manajemen Rantai Pasok Material terhadap Keterlambatan Pelaksanaan Proyek Konstruksi Jalan. Jurnal Ilmiah Teknik Unida, 3(1), 49–59.
https://doi.org/10.55616/jitu.v3i1.210
I Gede Putu Warka , Zaedar Gazalba, Handayani, T. (2023). Analisis Waktu dan Biaya Berdasarkan Analisa Produktivitas Tenaga Kerja pada Pembangunan Puskesmas Meninting Kabupaten Lombok Barat, Ganec Swara, 17(1), 131–144.
http://journal.unmasmataram.ac.id/index.php/GARA
Iman, S. (1995). Manajemen Proyek.
Lee, C., & Won, J. (2021). Analysis of Construction Productivity based on Construction Duration per Floor and per Gross Area, with Identification of Influential Factors. Journal of Civil Engineering and Management, 27(3), 203–216. https://doi.org/10.3846/jcem.2021.14514
Lidya, V. N., Ophiyandri, T., & Hidayat, B. (2024). Identifikasi Faktor Penting dalam Manajemen Material Pelaksanaan Pekerjaan Konstruksi Jalan. Ranah Research : Journal of Multidisciplinary Research and Development, 6(6), 2300–2309.
https://doi.org/10.38035/rrj.v6i6.1123
Martopo, A., & Soegiyanto. (2009). Penanganan Muatan.
Miln Bruantama, D., & Pontan, D. (2023). Identifikasi Waste Material an Faktor Penyebab Timbulnya Pada Proyek Konstruksi Identification of Waste Material Factors in Building Construction Projects. Jurnal Rekayasa Lingkungan Terbangun Berkelanjutan, 01(02), 396–401.
Pamuji, R., & Widyatami, F. S. (2022). Traffic Management and Engineering Works for Halim LRT-HSR Integration Station In Jakarta-Cikampek Toll Road Segment Km.1+280 to 1+420. Jurnal Teknik Sipil, 18(1), 87–105. https://doi.org/10.28932/jts.v18i1.4382
Prasetyo, D. F., & Girsang, H. (2025). Analisis Kinerja Biaya dan Waktu Pelaksanaan Erection Girder dengan Metode Crane dan Launcher. Borneo Engineering, 9(2), 19. https://doi.org/https://doi.org/10.35334/be.v9i2.67
Renaldi, D., & Edy. (2024). Menjelajahi Bahasa Python dengan Google Colab (Guepedia/Ag, Ed.). Guepedia.
Ma’rifat, R.A., I Made Suraharta, I.M. (2024). Efisiensi Pengadaan Material untuk Meminimalisasi Limbah Konstruksi Mengggunakan Pemodelan Persamaan Struktural. Syntax Idea, 2(3), 306–312. https://jurnal.syntax-idea.co.id/index.php/syntax-idea/article/view/1798
Rizki, R. F., & Farida, I. (2024). Probabilitas Pemilihan Angkutan Umum Bus dan Kereta Api. Jurnal Teknik Sipil, 20(2), 318–334. https://doi.org/10.28932/jts.v20i2.7312
Simatupang, J. . (2015). Pengaruh Percepatan Durasi Terhadap Waktu pada Proyek Konstruksi (Studi Kasus Pembangunan Persekolahan Eben Haezar Manado). Jurnal Sipil Statik, 281–291.
Solomon, M. D., Heineken, W., Scheffler, M., & Birth-Reichert, T. (2024). Cost Optimization of Compressed Hydrogen Gas Transport via Trucks and Pipelines. Energy Technology, 12(1). https://doi.org/10.1002/ente.202300785
Soplanit, P. P. G., Dundu, A. K. T., & Mangare, J. B. (2019). Optimasi Biaya Distribusi Material dengan Kombinasi Metode Nwc (North West Corner) dan Modi (Modified Distribution) pada Proyek Pembangunan Jembatan di Sulawesi Utara. Jurnal Sipil Statik, 7(12), 1633–1640.
Wahyudi, M. R., & Boer, A. (2019). Tingkat Efisiensi Biaya Pekerjaan Bekisting Struktur Core Wall Menggunakan Metode Semi Sistem dan Climbing System terhadap Metode Konvensional (Studi Kasus: Proyek Pembangunan Menara Bank Rakyat Indonesia Pekanbaru). Jurnal Saintis, 19(02), 51.
https://doi.org/10.25299/saintis.2019.vol19(02).3917
Wulandari, L. D. (2023). Perencanaan Logistik Konstruksi: Studi Literatur. CRANE: Civil Engineering Research Journal, 4(1), 15–22. https://doi.org/10.34010/crane.v4i1.9739
Yani, A. (2021). Minimalisasi Biaya Logistik pada Proses Distribusi dengan Pendekatan Joint Shipment Model. 15(1), 1–19.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Ganang Rizky Aditya, Hamonangan Girsang

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.