[1]
Aditya, G.R. and Girsang, H. 2026. Analysis of Construction Material Shipment Using Trucking and Joint Shipment Multiple Project Methods on Cost and Time. Jurnal Teknik Sipil. 22, 2 (Oct. 2026), 230–246. DOI:https://doi.org/10.28932/jts.v22i2.12693.