Aditya, G. R., & Girsang, H. (2026). Analysis of Construction Material Shipment Using Trucking and Joint Shipment Multiple Project Methods on Cost and Time. Jurnal Teknik Sipil, 22(2), 230–246. https://doi.org/10.28932/jts.v22i2.12693