Stefanus, S., & Lutfiansyah, Y. . (2025). Comparative Analysis of Quantity Take-Off Conventional Methods with Bim-Based Calculations in Bridge Concrete Structure Work: Case Study: Rengat-Pekanbaru Section of the Trans Sumatra Toll Road Project. Jurnal Teknik Sipil, 21(2), 249 –. https://doi.org/10.28932/jts.v21i2.8560