1.
Girsang H, Chamami I. Quality Control Production of Concrete Tunnel Segment Based on Six Sigma Method in the Mass Rapid Transit Project. jts [Internet]. 2024Apr.1 [cited 2024Sep.29];20(1):43-62. Available from: http://114.7.153.31/index.php/jts/article/view/6391